VIN WBS21EC05P9N86238
Outcome not recorded — whether the car sold, and for how much, is not in our data.
46 photographs on file.
Identity · what the VIN itself says
Vehicle identification number: WBS21EC05P9N86238
From the seller’s listing
Positions 1–3 — the world-manufacturer code.
In our data, VINs starting WBS belong to BMW.
Agrees with the listing.
Positions 4–8 — the descriptor. Here the maker encodes what the car is: the model, body and equipment.
In our data, VINs starting WBS21EC0 read as BMW X4M.
Agrees with the listing — the two names differ, but they name the same model line.
Position 9 — the check digit.
Shown exactly as the listing published it — we do not verify the check digit.
Position 10 — the model-year code.
Code P reads 2023. Model-year codes repeat every 30 years, so the reading nearest the listing’s own year is the one shown.
The seller’s listing says 2022; the VIN reads 2023. Both stay on file exactly as they came — we settle neither.
Position 11 — the assembly-plant code.
Plant codes are each maker’s own. We hold no list of them, so this character is shown, not decoded.
Positions 12–17 — the serial number.
Nothing is decoded from it. It is what makes this VIN one car rather than a model.
What the VIN encodes — X4M (G02) · 3.0 Competition · Petrol · 2022–2025
Machine-translated · original below
total loss. Scrap/relocation price inquiries Inquire about the valuation price because the second-hand price is high Car name:BMW X4 M Competition Model Number:21EC Format year: 2023 Date of first registration: 2022/12-20 Color:grey 성능점검유효기간:2022-12-20 ~ 2026-12-19
Also stated in the listing
Damage · as flagged in the seller’s listing
The stamp is the seller’s own word for the damage, printed as the listing filed it — the seller’s classification, never our assessment.
Also stated in the listing
BMW X4M · 2022 · clean-market comparables
The band covers clean-market retail listings of the same model and year, as of 19 Jul 2026. Read the band as a ceiling for a clean, fully-restored example — not as an estimate for this lot.
Model median price
₩6,590만
Clean-market listings
Median mileage in market
80,501 km
Clean-market listings
BMW X4M · 37 records on file
Odometer standing
Odometer 16,846 km — lower than 46% of the BMW X4M odometer readings on file.
Damage mix
Not enough BMW X4M records on file yet to say how common the Total loss stamp is.
The file
The BMW X4M records on file span 2016–2025; this car is a 2022.
Counted across our own BMW X4M records. A VIN that comes back to the block is filed again, so these are listings on file, not cars.
The official databases were asked about WBS21EC05P9N86238 · checked 24 Jul 2026
None on recordThe official databases returned no open or past campaigns for this VIN — it is their answer on the date above. A clean check is not a promise.
Related records · relists excluded
2021–2022 · 20 records on file
Claim: same maker + model, year ±1 — this VIN excluded.
전손 total loss-class records, any make · 70399 on file
Claim: same extracted damage class, any make — a salvage buyer shops the damage before the badge.