VIN WBS21CS02P9T10072
12 photographs on file.
Identity · what the VIN itself says
Vehicle identification number: WBS21CS02P9T10072
From the seller’s listing
Positions 1–3 — the world-manufacturer code.
In our data, VINs starting WBS belong to BMW.
Agrees with the listing.
Positions 4–8 — the descriptor. Here the maker encodes what the car is: the model, body and equipment.
In our data, VINs starting WBS21CS0 read as BMW XM.
Agrees with the listing.
Position 9 — the check digit.
Shown exactly as the listing published it — we do not verify the check digit.
Position 10 — the model-year code.
Code P reads 2023. Model-year codes repeat every 30 years, so the reading nearest the listing’s own year is the one shown.
Agrees with the listing.
Position 11 — the assembly-plant code.
Plant codes are each maker’s own. We hold no list of them, so this character is shown, not decoded.
Positions 12–17 — the serial number.
Nothing is decoded from it. It is what makes this VIN one car rather than a model.
What the VIN encodes — Xm (G09) · 4.4 · Hybrid · 2023–2025
Machine-translated · original below
** Our company is in the process of scrapping!! Area: Anseong transit conditions** Big thing Please evaluate after due diligence. The affected vehicle is a hybrid. Car name:BMW XM Model Number:21CS Format year: 2023 Date of first registration: 2023-09-25 color:white Performance check validity period: 2023-09-25 ~ 2027-09-24
Also stated in the listing
Damage · as flagged in the seller’s listing
The stamp is the seller’s own word for the damage, printed as the listing filed it — the seller’s classification, never our assessment.
Also stated in the listing
BMW XM · 2023 · clean-market comparables
The band covers clean-market retail listings of the same model and year, as of 4 Oct 2026. Read the band as a ceiling for a clean, fully-restored example — not as an estimate for this lot.
Model median price
₩12,744만
Clean-market listings
Median mileage in market
54,205 km
Clean-market listings
The official databases were asked about WBS21CS02P9T10072 · checked 23 Jul 2026
Notified
Aug 2024
[BMW] 7 models including BMW X5 M Competition - Engine control system software related recall
[비엠더블유] BMW X5 M Competition 등 7차종 - 엔진제어장치의 소프트웨어 관련 리콜
Notified
Dec 2024
[BMW] 63 models including BMW 218d Active Tourer - Recall related to integrated braking systems
[비엠더블유] BMW 218d Active Tourer 등 63차종 - 통합제동장치 관련 리콜
Notified
Aug 2024
[BMW] 61 models including BMW 220i Active Tourer - Recall related to integrated braking systems
[비엠더블유] BMW 220i Active Tourer 등 61차종 - 통합제동장치 관련 리콜
Notified
Mar 2024
[BMW] 34 models including BMW 218d Active Tourer - Recall related to integrated braking systems
[비엠더블유] BMW 218d Active Tourer 등 34차종 - 통합제동장치 관련 리콜
4 campaigns on this VIN · 1 open
Every filed appearance of WBS21CS02P9T10072 · 1 appearance
This VIN has appeared 1 time in our records.
Filed the same day across the auction houses — one auction event, recorded more than once. We count it as one appearance.
Listing ended11 Dec 2023Odometer at listing: not stated · 11 photographs filed전손 · Total lossOpen this listing →This is the first time this VIN appears in our records. If it returns to auction, every appearance will be listed here.
Outcome not recorded — whether the car sold, and for how much, is not in our data.
Related records · relists excluded
2023–2024 · 11 records on file
Claim: same maker + model, year ±1 — this VIN excluded.
전손 total loss-class records, any make · 70504 on file
Claim: same extracted damage class, any make — a salvage buyer shops the damage before the badge.