2022 BMW M4 Competition M xDrive

VIN WBS41AZ06NCK14884

Trading ended 11 Jun 2024 · 15:00 KSTHammer fell · 11 Jun 2024

Outcome not recorded — whether the car sold, and for how much, is not in our data.

29 photographs on file.

Fuel
Petrol
Mileage
43,445 km
Displacement
—not stated in listing
Exterior colour
—
First registered
—
Factory price
—
Lot no.
24-E-142595
End date
11 Jun 2024

What the VIN says

Identity · what the VIN itself says

Vehicle identification number: WBS41AZ06NCK14884

From the seller’s listing

What the VIN encodes — M4 (G82) · M4 Competition M xDrive · Petrol · 2023–2024

The seller’s account

Machine-translated · original below

Samsung total loss- Engine room fire- (engine mission damage) - No exterior abnormalities- Estimated repair cost: 87,000,000 won- Vehicle value: 87,980,000 won- Original injury mileage unconfirmed

Also stated in the listing

engine fireengine and transmission damageexterior undamagedestimated repair cost 87,000,000 krwvehicle value 87,980,000 krwodometer reading unconfirmed
원문 — the seller's Korean original
삼성 전손- 엔진룸 화재-(엔진 미션 손상)- 외관 이상없음- 예상수리비 :87,000,000 원- 차량가액: 87,980,000원- 원부상 주행거리 미확인

Damage · as flagged in the seller’s listing

Total loss

The stamp is the seller’s own word for the damage, printed as the listing filed it — the seller’s classification, never our assessment.

Also stated in the listing

engine fireengine and transmission damageexterior undamagedestimated repair cost 87,000,000 krwvehicle value 87,980,000 krwodometer reading unconfirmed
FRONTREAR
  • front
  • engine
  • left
  • right
  • roof
  • interior
  • airbag
  • frame
  • underbody
  • rear
Marked zones are the ones the seller's text states — nothing on this diagram is inferred.

Where the market sits

BMW M4 · 2022 · clean-market comparables

The band covers clean-market retail listings of the same model and year, as of 4 Oct 2026. Read the band as a ceiling for a clean, fully-restored example — not as an estimate for this lot.

Model median price

₩9,800만

Clean-market listings

Median mileage in market

27,020 km

Clean-market listings

Against the rest of the file

BMW M4 · 154 records on file

Odometer standing

Odometer 43,445 km — lower than 59% of the BMW M4 odometer readings on file.

Damage mix

53% of the BMW M4 records on file carry the Total loss stamp (전손) — this record is one of them.

The file

The BMW M4 records on file span 2015–2025; this car is a 2022.

Counted across our own BMW M4 records. A VIN that comes back to the block is filed again, so these are listings on file, not cars.

Recall notices

The official databases were asked about WBS41AZ06NCK14884 · checked 24 Jul 2026

None on record

The official databases returned no open or past campaigns for this VIN — it is their answer on the date above. A clean check is not a promise.

Elsewhere on the block

Related records · relists excluded

The cohort — M4 at auction

2022–2023 · 26 records on file

M4 records in the catalog →

Claim: same maker + model, year ±1 — this VIN excluded.