2017 BMW M2

VIN WBS1H9100HV917169

Trading ended 14 Oct 2022 · 18:00 KSTHammer fell · 14 Oct 2022

19 photographs on file.

Fuel
Petrol
Mileage
41,000 km
Displacement
—not stated in listing
Exterior colour
—
First registered
—
Factory price
—
Lot no.
22-E-78355
End date
14 Oct 2022

What the VIN says

Identity · what the VIN itself says

Vehicle identification number: WBS1H9100HV917169

From the seller’s listing

What the VIN encodes — M2 (F87) · Petrol · 2017

The seller’s account

Machine-translated · original below

Taxi deduction Indemnity or damage See photo - Left front part completely damaged - An accident during an illegal taxi U-turn Engine mission unconfirmed 2021/03 driving 41.000 km

Also stated in the listing

taxi vehicle historyaccident during illegal u turnengine/transmission not inspectedpartial damage
원문 — the seller's Korean original
택시 공제 면책 또는 분손 사진 참조 - 좌측 전면부 일체 파손 - 택시 불법유턴중 사고 엔진 미션 미확인 2021/03월 주행 41.000km

Damage · read from the seller’s listing

None
flagged

This listing has been machine-read, and none of the damage classes we stamp — total loss, flood, theft — appears in the seller’s text. No stamp is not a clean bill of health; only what the seller wrote is recorded here.

Also stated in the listing

taxi vehicle historyaccident during illegal u-turnengine/transmission not inspectedpartial damage
FRONTREAR
  • front
  • engine
  • left
  • right
  • roof
  • interior
  • airbag
  • frame
  • underbody
  • rear
Marked zones are the ones the seller's text states — nothing on this diagram is inferred.

Where the market sits

BMW M2 · 2017 · clean-market comparables

The band covers clean-market retail listings of the same model and year, as of 15 Oct 2026. Read the band as a ceiling for a clean, fully-restored example — not as an estimate for this lot.

Model median price

₩3,750만

Clean-market listings

Median mileage in market

83,504 km

Clean-market listings

Against the rest of the file

BMW M2 · 130 records on file

Odometer standing

Odometer 41,000 km — lower than 60% of the BMW M2 odometer readings on file.

The file

The BMW M2 records on file span 2016–2026; this car is a 2017.

Counted across our own BMW M2 records. A VIN that comes back to the block is filed again, so these are listings on file, not cars.

Recall notices

The official databases were asked about WBS1H9100HV917169 · checked 25 Jul 2026

Notified
Feb 2019

[BMW] 37 vehicles including 120d - Airbag-related recalls

[비엠더블유] 120d 등 37차종 - 에어백 관련 리콜

Remedied

1 campaign on this VIN

The paper trail

Every filed appearance of WBS1H9100HV917169 · 1 appearance

This VIN has appeared 1 time in our records.

Ended · this listing14 Oct 2022Odometer at listing: 41,000 km · 19 photographs filed

Filed the same day across the auction houses — one auction event, recorded more than once. We count it as one appearance.

Listing ended14 Oct 2022Odometer at listing: 41,000 km · 17 photographs filedOpen this listing →Listing ended14 Oct 2022Odometer at listing: 41,000 km · 19 photographs filedOpen this listing →

This is the first time this VIN appears in our records. If it returns to auction, every appearance will be listed here.

Outcome not recorded — whether the car sold, and for how much, is not in our data.

Elsewhere on the block

Related records · relists excluded