VIN WBS1H9100HV917169
19 photographs on file.
Identity · what the VIN itself says
Vehicle identification number: WBS1H9100HV917169
From the seller’s listing
Positions 1–3 — the world-manufacturer code.
In our data, VINs starting WBS belong to BMW.
Agrees with the listing.
Positions 4–8 — the descriptor. Here the maker encodes what the car is: the model, body and equipment.
In our data, VINs starting WBS1H910 read as BMW M2.
Agrees with the listing.
Position 9 — the check digit.
Shown exactly as the listing published it — we do not verify the check digit.
Position 10 — the model-year code.
Code H reads 2017. Model-year codes repeat every 30 years, so the reading nearest the listing’s own year is the one shown.
Agrees with the listing.
Position 11 — the assembly-plant code.
Plant codes are each maker’s own. We hold no list of them, so this character is shown, not decoded.
Positions 12–17 — the serial number.
Nothing is decoded from it. It is what makes this VIN one car rather than a model.
What the VIN encodes — M2 (F87) · Petrol · 2017
Machine-translated · original below
Taxi deduction Indemnity or damage See photo - Left front part completely damaged - An accident during an illegal taxi U-turn Engine mission unconfirmed 2021/03 driving 41.000 km
Also stated in the listing
Damage · read from the seller’s listing
None
flagged
This listing has been machine-read, and none of the damage classes we stamp — total loss, flood, theft — appears in the seller’s text. No stamp is not a clean bill of health; only what the seller wrote is recorded here.
Also stated in the listing
BMW M2 · 2017 · clean-market comparables
The band covers clean-market retail listings of the same model and year, as of 10 Oct 2026. Read the band as a ceiling for a clean, fully-restored example — not as an estimate for this lot.
Model median price
₩3,750만
Clean-market listings
Median mileage in market
83,504 km
Clean-market listings
BMW M2 · 130 records on file
Odometer standing
Odometer 41,000 km — lower than 60% of the BMW M2 odometer readings on file.
The file
The BMW M2 records on file span 2016–2026; this car is a 2017.
Counted across our own BMW M2 records. A VIN that comes back to the block is filed again, so these are listings on file, not cars.
The official databases were asked about WBS1H9100HV917169 · checked 25 Jul 2026
Notified
Feb 2019
[BMW] 37 vehicles including 120d - Airbag-related recalls
[비엠더블유] 120d 등 37차종 - 에어백 관련 리콜
1 campaign on this VIN
Every filed appearance of WBS1H9100HV917169 · 1 appearance
This VIN has appeared 1 time in our records.
Filed the same day across the auction houses — one auction event, recorded more than once. We count it as one appearance.
Listing ended14 Oct 2022Odometer at listing: 41,000 km · 17 photographs filedOpen this listing →This is the first time this VIN appears in our records. If it returns to auction, every appearance will be listed here.
Outcome not recorded — whether the car sold, and for how much, is not in our data.
Related records · relists excluded
2017–2018 · 67 records on file
Claim: same maker + model, year ±1 — this VIN excluded.